A concrete slab is the most common residential and commercial pour. Accurate thickness measurement is critical because even a 1-inch depth error changes total yardage by 25% on a 4-inch slab.
Formula: Slab Volume = Length × Width × Thickness × Quantity
| 10×10 ft (4 in thick) | 1.23 yd³ · 0.94 m³ · 56 × 80 lb bags |
| 12×12 ft (4 in thick) | 1.78 yd³ · 1.36 m³ · 80 × 80 lb bags |
| 20×20 ft (4 in thick) | 4.94 yd³ · 3.78 m³ · 223 × 80 lb bags |
| 20×20 ft (6 in thick) | 7.41 yd³ · 5.66 m³ · 334 × 80 lb bags |
Compact a 4-inch gravel sub-base first, measure length and width at multiple points, convert slab thickness from inches to feet (divide by 12), and multiply L × W × T ÷ 27 for cubic yards.